INSTALLATION & OPERATIONAL MANUAL
VK / TR / VFRY SERIES GAS FRYERS
With KleenScreen PLUS® Filtration Systems
1VK45C Shown
MODELS:
1VK45 | 1TR45 |
1VK65 | 1TR65 |
1VK85 | 1TR85 |
2VK45 | 2TR45 |
2VK65 | 2TR65 |
2VK85 | 2TR85 |
3VK45 | 3TR45 |
3VK65 | 3TR65 |
3VK85 | 3TR85 |
4VK45 | 4TR45 |
4VK65 | 4TR65 |
4VK85 | 4TR85 |
5VK45 | 5TR45 |
5VK65 | 5TR65 |
5VK85 | 5TR85 |
6VK45 | 6TR45 |
6VK65 | 6TR65 |
6VK85 | 6TR85 |
2MB | VFRY18 |
3MB | |
4MB | |
5MB | |
6MB |
IMPORTANT FOR YOUR SAFETY
THIS MANUAL HAS BEEN PREPARED FOR PERSONNEL QUALIFIED TO INSTALL GAS EQUIPMENT, WHO SHOULD PERFORM THE INITIAL FIELD START-UP AND ADJUSTMENTS OF THE EQUIPMENT COVERED BY THIS MANUAL.
POST IN A PROMINENT LOCATION THE INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THE SMELL OF GAS IS DETECTED. THIS INFORMATION CAN BE OBTAINED FROM THE LOCAL GAS SUPPLIER.
IMPORTANT
IN THE EVENT A GAS ODOR IS DETECTED, SHUT DOWN UNITS AT THE MAIN SHUTOFF VALVE AND CONTACT THE LOCAL GAS COMPANY OR GAS SUPPLIER FOR SERVICE.
FOR YOUR SAFETY
DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE.
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
INTRODUCTION
GENERAL
Vulcan Fryers are produced with quality workmanship and material. Proper installation, usage and maintenance will result in years of satisfactory performance.
Before installing the fryer, thoroughly read this manual and carefully follow all instruction.
This manual is applicable to models listed on the cover page. Procedures in this manual will apply to all models unless specified. Pictures and illustrations can be of any model unless the picture or illustration needs to be model specific.
ORDERING PARTS
Customers may order parts directly from their local authorized service center. If not known, call Vulcan Customer Service at 800-814-2028.
To speed up your order, provide the model number, serial number, gas type, part needed, item part number (if known) and quantity needed.
UNPACKING
This fryer was carefully inspected before leaving the factory. The carrier assumes full responsibility for the safe delivery upon acceptance of the shipment. Check for possible shipping damage immediately after receipt.
If the fryer is found to be damaged, complete the following steps:
- Carrier must be notified within 5 business days of receipt.
- Carrier’s local terminal must be notified immediately upon discovery (note time, date, and who was spoken to), and follow up and confirm with written or electronic communication.
- All original packing materials must be kept for inspection purposes.
- The fryer cannot have been moved, installed, or modified.
- Notify Vulcan Customer Service immediately at 800-814-2028.
Check that the following have been included:
- Crumb Rack(s)
- Basket Hanger(s)
- Tank Brush for Boil Out Procedure Only
- Adjustable Casters (4) two locking, two non-locking for freestanding fryers. Fryer Batteries with the KleenScreen PLUS® Filtration System have casters installed from the factory.
- Drain Pipe Extension for freestanding fryers only.
- Twin Fry Baskets (2) per fry tank
- Cleanout Rod
- Fryer Batteries with the KleenScreen PLUS® Filtration System
- Filter Pan
- Suction Tube
- Screen Assembly
- High temperature discard hose
- Manual, Quick Start Guide(s), and Warranty – Keep in safe place for future reference.
INSTALLATION
Do not use the door or its handle to lift the fryer.
Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications on the fryer data plate, which is located on the inside of the door panel.
Make sure the fryer is configured for the proper elevation.
Record your fryer model, device, and serial numbers for future reference in the space provided below. This information can be found on the fryer data plate.
Fryer Model No: Device: Serial No: Clearances
- Minimum clearance from combustible construction: 6” (15 cm) from the sides of the fryer
6” (15 cm) from the back of the fryer
The fryer may be installed on combustible floors
- Minimum clearance from noncombustible construction: 0” from the sides of the fryer
0” from the back of the fryer
- Between the fryer and any open-top flame units: 16” (41 cm)
- Allow space for servicing and operation.
- Install fryer in an area with sufficient air supply for gas combustion.
- Do not obstruct the flow of combustion and ventilation air.
- Provide adequate clearance for air openings into the combustion chamber.
- Do not permit fans to blow directly onto fryer.
- Keep the fryer area free and clear from combustibles.
- Avoid wall-type fans, which create cross-currents within a room. Avoid open windows next to sides or back.
CODES AND STANDARDS
The fryer must be installed in accordance with:
In the United States:
- State and local codes, or in the absence of local codes, with:
- National Fuel Gas Code, ANSI-Z223.1/NFPA #54 (latest edition). Copies may be obtained from The American Gas Association Accredited Standards Committee Z223, @ 400 N. Capital St. NW, Washington, DC 20001 or the Secretary Standards Council, NFPA, 1 Batterymarch Park Quincy, MA 02169-7471.
- NFPA Standard #96 Vapor Removal from Cooking Equipment, latest edition, available from the National Fire Protection Association, Batterymarch Park, Quincy, MA. 02169-7471.
- National Electrical Code, ANSI/NFPA-70 (latest edition). Copies may be obtained from The National Fire Protection Association, Batterymarch Park, Quincy, MA. 02169-7471.
- In the commonwealth of Massachusetts all gas appliances vented through a ventilation hood or exhaust system with a damper or with a power means of exhaust shall comply with 248 CMR.
In Canada:
- Local codes
- CAN/CSA-B149.1 Natural Gas and Propane Installation Code (latest edition),available from the Canadian Standards Association, 155 Queen Street, Suite 1300, Ottawa, Ontario Canada K1P 6L1.
- CSA C22.1 Canadian Electric Code (latest edition), available from the Canadian Standards Association, 155 Queen Street, Suite 1300, Ottawa, Ontario Canada K1P 6L1.
ASSEMBLY
The fryer must be restrained to prevent tipping and the splashing of hot liquid. The means of restraint may be the manner of installation, such as connection to a battery of appliances, installing the fryer in an alcove, or by separate means such as adequate ties.
FLUE CONNECTION
Make the flue connection as follows:
- Comply with Vapor Removal from Cooking Equipment, ANSI-NFPA Standard #96 (latest edition), available from the National Fire Protection Association, Batterymarch Park, Quincy, MA 02269.
- Locate the fryer under a hood with adequate connection to an exhaust duct. The hood must extend 6” (15 cm) beyond fryer on both sides.
- Clearance above the fryer should be adequate for combustion byproducts to be removed efficiently.
- An 18” (46 cm) minimum clearance should be maintained between the flue vent and the filters of the hood venting system.
- Never make flue connections directly to the fryer.
- Do not obstruct the flow of the gases from the appliance. Proper air balance should be maintained in the room.
- Ensure that your ventilation system does not cause a down draft at the fryer’s flue opening. Down drafts will not allow the fryer to exhaust properly and will cause overheating which may cause permanent damage. Damage caused by down drafts will not be covered under equipment warranty. NEVER allow anything to obstruct the flue of combustibles or ventilation exiting from the fryer flue. DO NOT put anything on top of flue area.
ELECTRICAL CONNECTION
Electrical Grounding Instructions:
This appliance is equipped with a three prong (grounding) plug for your protection against shock hazard and should be plugged directly into a properly grounded three-prong receptacle. Do not cut or remove the grounding prong from this plug. Fryer must be electrically grounded in accordance with local codes, or in the absence of local codes, with the National Electrical Code, ANSI/NFPA 70, or the Canadian Electrical Code, CSA C22.2, as applicable.
Electrical diagram located on inside of door.
GAS CONNECTION
All gas supply connections and any pipe joint compound must be resistant to the action of propane gases.
The gas inlet is located on the lower rear of the fryer. Codes require that a gas shutoff valve be installed in the gas line ahead of the fryer.
The gas supply line must be at least the equivalent of ½” (12.7 mm) iron pipe for single units and 1-1/4” (31.75 mm) for batteries. If using the optional quick-disconnect flex hose,
¾” (19 mm) iron pipe for single units and 1-1/4” (31.75 cm) iron pipe for batteries.
Make sure the pipes are clean and free of obstructions, dirt, and piping compound. A battery requires one or two connections of appropriate size for the gas requirement.
Prior to lighting, check all joints in the gas supply line for leaks. Use soap and water solution. Do not use an open flame.
After piping has been checked for leaks, fully purge gas pipes to remove air.
GAS PRESSURES (ALL MODELS):
The gas measured exiting the gas valve should be set at .08” W.C. (Water Column) (0.02 kPa) for natural gas and .08” W.C. (0.02 kPa) for propane gas. This fryer has been gas calibrated at the factory to achieve maximum performance. Do not make any adjustments to the gas valve assembly. The supply pressure should be 7-9” W.C. for natural gas and 11-12” W.C. for propane gas. If incoming pressure exceeds 14” WC (½ psig -3.45 kPa), a step-down pressure regulator must be installed.
TESTING THE GAS SUPPLY PIPING SYSTEM:
When test pressures exceed ½ psig (3.45 kPa), the fryer and its individual shutoff valve must be disconnected from the gas supply piping system.
When test pressures are ½ psig (3.45 kPa) or less, the fryer must be isolated from the gas supply piping system by closing its individual shutoff valve.
Separate instructions for installing casters are included with the casters:
- The installation shall be made with a connector that complies with the
Standard for Connectors for Movable Gas Appliances, ANSI Z21.69, CAN/CGA- 6.16, and a quick-disconnect device that complies with the Standard for Quick-
Disconnect Devices for Use with Gas Fuel, ANSI z21.41.CSA 6.9 or Quick- Disconnect Devices for Use with Gas Fuel.
- When installing a quick disconnect you must also install a means for limiting the movement of the fryer. This device will prevent the gas line or quick disconnect from being strained. The restraining device should be attached to the cutout on the back panel. See illustration for location.
- The fryer must be installed with a connector (not supplied by Vulcan) complying with the above codes.
- The fryer must be installed with restraining means to guard against transmission of strain to the connector. See illustration.
- The fryer must be installed with the casters provided.
- If the restraint is ever to be disconnected, first turn the gas supply off. If disconnection of the restraint is necessary, reconnect this restraint after the fryer has been returned to its originally installed position.
LEVELING THE FRYER
Check the level of the fryer by placing a level on top of the fryer after gas connections have been made.
Ensure that the fryer is level front-to-back and side-to-side in the final installed position. If using casters, lock the wheels after unit is level.
OPERATION
Hot oil and parts can cause burns. Use care when operating, cleaning and servicing the fryer.
Spilling hot frying compound can cause severe burns. Do not move fryer without draining all frying compound from the tank.
Fryer is not to be used during a power outage.
OVER-TEMPERATURE SHUTDOWN
If the shortening becomes overheated, a high-temperature shutoff device will turn the gas valve off.
If the fryer shuts down due to overheating, DO NOT power up the fryer until the shortening temperature is below 300°F (149°C).
If an overheating situation persists, contact your local Vulcan authorized service office.
BEFORE FIRST USE
New units are wiped down at the factory to remove any visible signs of dirt, oil, grease, etc. remaining from the manufacturing process.
Before any food preparation, thoroughly wash the protective oil from all surface parts and the tank interior with hot soapy water to remove any film residue and dust or debris.
Do not use chlorine or sulfate/sulfide cleaners.
- Wash any accessories shipped with unit.
- Rinse fryer and accessories thoroughly and drain the fryer.
- Wipe tank completely dry with a soft, clean cloth.
- Close the drain valve.
- Fill the fryer tank with liquid shortening.
- Shortening level should be between the min and max lines in the fryer tank.
- Shortening will expand when heated. Do not fill the fryer tank past the MAX line.
- Add fresh shortening as needed to maintain oil level.
BASIC FRYING INSTRUCTION
- Set the desired temperature and allow shortening to heat up to that temperature.
- Fry items that are the same size to ensure equal doneness.
- Drain or wipe dry raw or wet foods to minimize splatter when lowering into hot shortening.
- Add fresh shortening as needed.
- Do not overfill baskets. (See table for recommended basket capacities below) Carefully lower basket into oil.
- When frying doughnuts and fritters, turn product only once during frying.
- When cooking French fries or onion rings, shake the basket several times.
- Batter covered foods should be dropped carefully, one by one, into shortening or basket. If you use the basket, first dip the basket into the shortening to
reduce batter-build up on basket surfaces.
- When frying is completed, remove basket or product. Hang basket on rear hanger.
1VK / TR45 & VFRY18: Recommended pounds per basket are 2.5 lbs. (1.1 kg). 1VK / TR65: Recommended pounds per basket are 3.0 lbs. (1.4 kg).
1VK / TR85: Recommended pounds per basket are 3.5 lbs. (1.6 kg).
EXTENDING SHORTENING LIFE
Shortening life can be extended by the following guidelines:
- Do not salt foods over the fryer.
- Use good-quality shortening.
- Filter shortening daily (at a minimum).
- Replace shortening if it becomes poorly flavored.
- Keep equipment and surrounding clean. Use tank covers when not in use. (accessory).
- Set thermostat correctly.
- Remove excess moisture and particles from food products before placing on fryer.
TURNING ON THE FRYER
(VK / TR / VFRY)A solid state knob control:
- Open the door to the fryer. Select Liquid or Solid Shortening by pressing the switch to the desired selection.
- Set temperature by turning the knob to the desired temperature.
- Press the power switch to the ON position. The burners will not light until the next step is completed.
- Press the START switch once for the burners to light. The START switch is a momentary switch and will reset after being pressed. The indicator light will change from Red to Green. Heating light will glow Yellow.
- The power burner will cycle on and off throughout the melt cycle. When the fry tank oil reaches 135°F the burners will stop cycling and remain on until the set temperature is reached. Once set temperature is reached the burners will cycle on and off to maintaining the set temperature.
(VK / TR)D solid state digital and (VK / TR)C programmable controls:
For solid state digital and programmable computer controls the power burner will light automatically. The power burner will cycle on and off throughout the melt cycle and continue afterwards maintaining the set temperature.
TURNING OFF THE FRYER
- Press the power switch to the off position.
DRAINING THE TANK
Freestanding Models ONLY:
- Turn off fryer.
- Insert the drain extension into the drain valve. Tighten only hand tight.
- Direct the drain spout into the container that you want to drain the shortening into.
- Open the drain valve. The oil will drain into the container. When the container is full or the fryer tank is empty, close the drain valve. Repeat this step until the fryer is empty. Remove the drain extension and place it back into the provided holder.
- It is recommended to now boil out your fry tank. Follow the Boil Out procedure. Then perform the weekly clean-out as described under CLEANING.
- Once tank is completely empty, boiled out and cleaned, add new shortening. Turn on the power switch to begin heating the oil to desired temperature.
BOIL OUT PROCEDURE
Weekly or when oil is replaced: Freestanding Models ONLY:
- Drain the tank as described under DRAINING THE OIL.
- Close the drain valve and fill tank with water. Use a boil out solid degreaser which can be ordered from your local dealer. Follow the instructions on the side of the package.
Do not use chlorine or sulfate/sulfide cleaners.
- Solution level must be between the MIN and MAX levels on the fryer tank.
- Turn the power switch to the on position. With solid state knob controls (A), set the temperature knob to 200°F. Press the start button. Water boils at 212°F. For solid state digital models (D) and computer models (C) models, the temperature will automatically set for 195-200°F. Do not bring water temperature to an overly active boil.
- Use the tank brush; clean the sides, bottom and heat exchanger tubes.
- Screw the drain extension in the drain valve and hand tighten only. Drain the cleaning solution from the tank into a container.
- Close the drain valve and refill the tank with water. Add 1 cup (1/4 L) of vinegar to neutralize alkaline left by the cleaner. Solution level must be between the MIN and MAX level on the fryer tank. Press the start button for (A) and Temp Button for (D) and C) models, to allow the solution to heat up. Allow solution to stand for a few minutes.
- Drain the tank according to DRAINING THE TANK. Rinse thoroughly with clear, hot water. All traces of cleaner must be removed. Dry the tank thoroughly.
- Close the drain valve and add shortening. Follow the FILLING TANK WITH SHORTENING procedure in this manual. The fryer is now ready for use. Press the start button for (A) and Temp Button for (D) and C) models, to allow the solution to heat up.
CLEANING
Hot oil and hot parts can cause burns. Use care when operating, cleaning, and servicing the fryer.
Clean your fryer regularly with the tank brush along with a damp cloth, and polish with a soft dry cloth. If regular cleaning is neglected, grease will be burned on and discolorations may form.
Fingerprints are sometimes a problem on highly polished surfaces of stainless steel. They can be minimized by applying a cleaner that will leave a thin oily or waxy film.
- Clean all exterior surfaces of your fryer at least once daily.
- Use a damp cloth with warm water and a mild soap or detergent.
Do not use chlorine or sulfate/sulfide cleaners.
- Rinse thoroughly, and then dry with a soft dry cloth.
- Keep the fryer exterior clean and free of accumulated grease to prevent stubborn stains from forming. If regular cleaning is neglected, grease will be burned on and discolorations may form.
- Remove discolorations by washing with any detergent or soap and water.
- Use a self-soaping, non-metallic scouring pad for particularly stubborn discolorations.
- Always rub with the grain of the stainless steel.
- Do not use a metallic scoring pad or harsh cleaners.
Air Filter Cleaning (VK fryers only):
The air filter needs to be cleaned at least once every three months. Pull the air filter off and clean in a dishwasher or by hand. Dry thoroughly before replacing it into position. There is no need to tighten the band clamp with tools.
EXTENDED SHUTDOWN
- Thoroughly drain the fryer. Refer to DRAINING THE FRYER.
- Clean the fryer according to CLEANING.
- Push Power switch to the off position
- Turn off the main gas shutoff valve.
KleenScreen Plus® Filtration System
General
The KleenScreen PLUS® filtration system filters the oil as it is pumped back into its’ respective tank(s). Only one tank can be drained and filtered at a time. Under no circumstances should both tanks be drained at the same time.
Assembly
- After unpacking, wash the filter pan, crumb basket and filter screen assembly. Make sure you remove the insert located inside the filter screen. Use dishwashing detergent and warm water, (parts are dishwasher safe). Rinse the filter pan, crumb basket and filter screen components completely and wipe all parts dry with a clean cloth.
- Pull out the filter drawer all the way leaving the filter pan opening exposed.
- Place the filter tank into the filter drawer making sure that the pins on the bottom of the filter pan line up with the holes in the filter drawer. Position the filter screen assembly into the suction tube clip in the filter pan positioning the filter screen assembly flat on the bottom of the filter pan.
- Carefully line up the suction tube nozzle so that it mates with the oil receptacle block mounted on the frame of the fryer battery. Close the drawer. See Figures 1, 2 3 and 4
Fully assembled filter screen assembly:
Fig. 2
Micro-Filtration Fabric Envelope Accessory Assembly:
INSTRUCTIONS TO REMOVE & REPLACE KLEENSCREEN PLUS® FILTER ENVELOPE
FOR ABSOLUTE FILTRATION & MAXIMUM FLOW RATE WE RECOMMEND YOU CHANGE YOUR FILTER ENVELOPES AT EVERY OIL CHANGE (10-14 DAYS DEPENDING ON OIL USAGE).
Step 1
Discard all oil from the filter vessel, (see pages 23 or 24). When the filter pan is empty, use a spatula and scrape off all debris left on the filter envelope and in the filter pan.
Step 2
Unscrew “S” Tube from filter by turning the Bottom Knurled fitting counter- clockwise.
Step 3
Remove SST Closure Clip by lifting off one side.
Step 4
Remove SST Filter Screen Insert and wash insert with hot water and dry thoroughly. The Filter Screen Insert is dishwasher safe. Place the insert into a new KleenScreen PLUS® Filter envelope.
DO NOT WASH FABRIC ENVELOPE
Step 5
Place Filter Screen Insert into the fabric envelope making sure that the holes line up. Fold over the other end of the envelope and place SST Closure Clip on – hinge over and firmly press clip all the way down to secure and seal filter assembly. Making sure that the folded end is face down; screw “S” Tube Assembly onto the Filter Assembly. Tighten the Bottom Knurled fitting. When tightened, the “S” Tube assembly should be perpendicular to the long side of the filter assembly.
Step 6
Reposition the filter tube into the provided clip. Align filter tube so that the end of the “S” Tube engages the Oil Receptacle fitting each time the drawer is opened and closed.
Operation
Hot oil and parts can cause burns. Use care when operating, cleaning and servicing the fryer.
Spilling hot frying compound can cause severe burns. Do not move fryer without draining all frying compound from the tank.
Never run water or boil out solution through filter and motor / pump. Doing so will void your fryer warranty.
Filter ONLY one fry tank at a time
FILTERING PROCEDURE – KleenScreen PLUS® Models ONLY
Filter shortening at least once a day.
Do NOT turn off the power to the fryer. Leave power on.
- Vulcan recommends adding an oil treatment media to the oil prior to filtering.
- Make sure that the filter drawer is closed completely and that the suction tube and receptacle block are in the correct position. Fig. 5
Fig. 5
- A cold fryer will not drain easily. Always filter shortening between 250°F and 350°F. The shortening in the cold zone area will remain hard if the heat is only on for a few minutes. If necessary, use the clean-out rod to carefully move the hard shortening to an area above the cold zone where it will melt.
- Slowly open the drain valve to allow oil to flow from the fry tank to the filter pan. Then open the drain valve all the way. Please note the gas power burner will automatically turn off at this point. DRAINING will appear on the digital display for solid state digital (D) and DRAINING OIL will display on computer models (C).
- When fry tank is empty turn on the filter pump by pressing the filter button on the (A) control or by holding your finger on the filter icon for 3-4 seconds on the solid state digital models (D) and for computer models (C). Allow the pump to filter the oil for a couple of minutes BEFORE closing the drain valve.
- Close the drain valve. The display will change to; FILL TANK for solid state digital models (D) and FILL TANK for computer models (C).
- Fill tank with new shortening. Fill to a minimum of the MIN level but no higher than halfway between MIN and MAX. Oil will expand as it is heated.
- On solid state digital models (D) and computer models (C) models, the display will ask if the tank is full; TANK FULL, HIT TEMP. If the tank is full, press the Temp Button on the display. Once pressed, the gas power burner will ignite and begin heating the oil to desired temperature.
- Press the START button for solid state knob control (A) and gas power burner with ignite and begin heating the oil.
Filtering Instructions for Solid State Controls
Hot oil and hot parts can cause burns.
Never run water or boil out solution through filter and motor / pump. Doing so will void your fryer warranty.
FILTERING TIP:
Open the filtering drawer approximately 1” to allow any oil in the return line to run back into the filter pan. This will take about 30 seconds to complete. Then open the drawer completely to clean filter components.
REMOVING EXCESS DEBRIS FROM THE SCREEN FILTER:
- Pull the filter drawer out.
- Remove the filter screen assembly. Scrape debris from the filter screen. Then remove the insert by unlatching the latch. Clean all parts thoroughly as mentioned in the assembly section on page 19.
- Scrape debris from the bottom of the filter pan and discard in the trash. Clean all parts thoroughly as mentioned in the Assembly section on page 19. Clean all parts thoroughly as mentioned in the Assembly section on page 19.
- Reassemble all filter components after being dried thoroughly as in the assembly section on page 19.
FLUSH/RINSE AND DISCARD OIL:
- Follow filtering instructions 1-3, however do not put oil treatment media into the fryer. Drain the fryer oil into the filter pan.
- Attach the quick disconnect hose to the discard male quick disconnect fitting,
3. To discard the oil, place the nozzle end of the discard hose into a container that is large enough to retain the discarded shortening. Press the filter switch behind the door to the “USE HOSE TO DISCARD ONLY” position. This will allow all of the oil to be pumped through the hose only.
4. For flushing/rinsing the tank with filtered oil to remove the particulates that have accumulated, press the filter switch behind the door to the “USE HOSE TO RINSE AND FILL” position. This will allow the oil to pass through the hose and come in from behind the tank at the same time.
5. With the power switch still ON; press the discard/flush switch on. Press and hold the filter button for at least 3 seconds and the Motor/Pump will begin to operate. NOTE: Oil will exit immediately out of the nozzle end of the hose.
6. Once the oil has been discarded completely and the filter pan is empty, press the filter button to turn off the Motor/ Pump. Then press the discard/flush switch off.
7. Disconnect the discard hose. The hose connection will be hot due to the temperature of the oil that was discarded. Be careful to let the hose drain before putting away. Close the drain valve and fill the fry tank with new oil.
BOIL OUT PROCEDURE:
Use the Boil Out By-Pass™ drain extension allowing the boil out solution to exit the fry tank without using the filtering system. Do NOT allow water to run through the motor / pump. Drain the boil out solution into a bucket or place a high temperature rated water hose on the end of the drain extension allowing the other end to flow into a floor drain. In Fig. 6 the arrow is pointing to the drain extension. It is threaded into the top coupling of the oil drain tube. Drain extension needs to be only hand tightened.
Boil Out By-Pass™ Extension Tube
Fig. 6
Standard Hose End (Smaller Thread Side) Drain Tube End (Larger Size Threads)
THERMAL OVERLOAD PROTECTION BUTTON:
The motor/pump supplied with the filtering system has a thermal overload protection circuit that senses when excess heat occurs. This can occur due to filtering for long periods of time or under heavy load prior to discarding debris buildup. If the thermal overload protection is tripped, wait 5 minutes and then reset the motor by pushing in the red button. The arrow in Figure 7 shows the location of the reset button; located on the front of
Hot oil and hot parts
Fig 7.
MAINTENANCE
Hot oil and hot parts can cause burns. Use care when operating, cleaning, and servicing the fryer.
Spilling hot fryer compound can cause severe burns. Do not move fryer without draining all frying compound from the tank.
FLUE VENT INSPECTION
When the fryer is cool, inspect annually. Check the flue and clear any obstructions.
Contact the Service Contractor in your area to obtain service and parts information. For a complete listing of Service and Parts depots refer to www.vulcanequipment.com.
ALARMS AND ERROR MESSAGES
NO OR LOW GAS SUPPLY – If no action is taken after 90 seconds, an alarm sounds continuously, the heat demand is disabled and any running cooking cycles are cancelled. The digital display the following message:
“D” Solid State – IGNITION LOCKOUT
“C” Computer – IGNITION LOCKOUT CHECK GAS SUPPLY
The fryer must be turned off, then back on to re-initialize the control and to have normal functions resumed.
OPEN PROBE – If an open probe is detected, the heat demand is disabled and any running cooking cycles are cancelled. All operator buttons are disabled. The digital control displays the following message:
“D” Solid State – OPEN PROBE “C” Computer – PROBE OPEN
SHORTED PROBE – If a shorted probe is detected, the heat demand is disabled and any running cooking cycles are cancelled. All operator buttons are disabled. The digital control displays the following message:
“D” Solid State – SHORTED PROBE “C” Computer – PROBE SHORT
Hi TEMPERATURE – If the temperature is greater than or equal to 415°F (212°C), the heat demand is disabled and any running cooking cycles are cancelled. All operator buttons are disabled. The control displays the following message:
“D” Solid State – HIGH TEMP
“C” Computer – HIGH TMP HIGH TMP
Troubleshooting Chart: | |
Problem: | Probable Cause: |
No Heat: | Power switch not turned on. Gas supply not turned on. Wire connections loose (call service) Wires connections need cleaning High Limit (call service) |
Insufficient or too much heat: | Temperature not set to desired temperature. High limit tripped (call service) Temperature probe (call service) |
Tank will not drain: | Shortening too cold. Drain pipe clogged with debris. |
Motor / pump will not pump oil: | Suction tube not seated correctly in receptacle block. Filter screen is clogged and needs cleaning. Shortening is too thick / cold. Heat oil up to min. 300º F. Discard valve lever not fully engaged either for filtering or discarding. Thermal overload protection button tripped. |